HOLLAND PARK, LONDON
Holland Park, London Before
________________
Holland Park, London genuine antique oak floor After
________________
RESIDENTIAL HOUSE CAMBRIDGE
Before
________________
Solid aged oak Herringbone Blocks
________________
OLD PINE STAIRCASE REFURBISHMENT
Old pine staircase before
________________
Pine staircase clad in oak aged boards after
________________
MAIN DINING HALL CORPUS CHRISTI COLLEGE CAMBRIDGE
Brief - to match raised area to original floor in main dining hall
________________
Achieved using prime oak boards salvaged from a London Club and hand finishing with wax
________________
EXTRA WIDE AND EXTRA LONG COMPOSITE DECKING BOARDS
Before - Replace rotten softwood framework with hardwood joists.
________________
After - Composite decking 242mm wide planks 6m long.
________________
REFURBISHMENT OF BANKERS RESTAURANT IN BRIGHTON
Before
________________
Transformed with Karndean Herringbone
________________
KITCHEN AND DINING ROOM REDESIGNED
During installation over UFH
________________
Extra wide and extra long Douglas Fir
________________
KITCHEN AND NEW CONSERVATORY
Before
________________
Rustic Oak Oiled
________________
NEW GAMES ROOM
Before
________________
Character Oak Chocolate Lacquered
________________
WINE CELLAR
Before
________________
Character Oak Chocolate Lacquered
________________
DAMAGED SCHOOL FLOOR
Before
________________
Repaired and Sanded Rubberwood
________________
REFURBISHMENT OF HALLWAY & DINING ROOM
Latex Levelling Compound
________________
Engineered Prime Oak Raw Oiled
________________
ESTATE AGENT REFURBISHMENT
During Refurbishment
________________
Rustic Oak Gunsmoke Grey
________________
KITCHEN DINING ROOM
Before
________________
Wide Plank Prime Oak Blanchon Oiled
________________
DEPARTMENT STORE REFURBISHMENT
Before
________________
Rustic Oak Iced Tea
________________
FLOOR RESTORED TO FORMER GLORY
Floor before cleaning!
________________
Floor cleaned and buffed
________________
NEW BUILD
Before
________________
Engineered Rustic Oak White Oiled
________________
CONVERSION OF TUDOR WATERMILL
During Construction
________________
38mm Opepe Deckboards
________________