Andrew Banks Projects

HOLLAND PARK, LONDON

Holland Park, London Before

________________

Holland Park, London genuine antique oak floor After

________________

RESIDENTIAL HOUSE CAMBRIDGE

Before

________________

Solid aged oak Herringbone Blocks

________________

OLD PINE STAIRCASE REFURBISHMENT

Old pine staircase before

________________

Pine staircase clad in oak aged boards after

________________

MAIN DINING HALL CORPUS CHRISTI COLLEGE CAMBRIDGE

Corpus Christi College floor before

Brief - to match raised area to original floor in main dining hall

________________

Corpus Christi College Cambridge floor after refurbishment

Achieved using prime oak boards salvaged from a London Club and hand finishing with wax

________________

EXTRA WIDE AND EXTRA LONG COMPOSITE DECKING BOARDS

Andrew Banks decking before

Before - Replace rotten softwood framework with hardwood joists.

________________

Composite decking 242mm wide planks 6m long

After - Composite decking 242mm wide planks 6m long.

________________

REFURBISHMENT OF BANKERS RESTAURANT IN BRIGHTON

Bankers Restaurant before

Before

________________

Bankers Restaurant after - karndean herringbone

Transformed with Karndean Herringbone

________________

KITCHEN AND DINING ROOM REDESIGNED

dineson gerrard 06 during fitting

During installation over UFH

________________

Wide Plank Douglas Fir White Oiled

Extra wide and extra long Douglas Fir

________________

KITCHEN AND NEW CONSERVATORY

projects_before_25

Before

________________

Rustic Oak Oiled

________________

NEW GAMES ROOM

wood-floor-before1

Before

________________

wood-floor-after1

Character Oak Chocolate Lacquered

________________

WINE CELLAR

wood-floor-before2

Before

________________

wood-floor-after2

Character Oak Chocolate Lacquered

________________

DAMAGED SCHOOL FLOOR

school_floor_before

Before

________________

schoo floor after

Repaired and Sanded Rubberwood

________________

REFURBISHMENT OF HALLWAY & DINING ROOM

projects before 4

Latex Levelling Compound

________________

projects after 4

Engineered Prime Oak Raw Oiled

________________

ESTATE AGENT REFURBISHMENT

During Refurbishment

________________

Rustic Oak Gunsmoke Grey

________________

KITCHEN DINING ROOM

Before

________________

Wide Plank Prime Oak Blanchon Oiled

________________

DEPARTMENT STORE REFURBISHMENT

projects before 7

Before

________________

projects after 7

Rustic Oak Iced Tea

________________

FLOOR RESTORED TO FORMER GLORY

projects before 8

Floor before cleaning!

________________

projects after 8

Floor cleaned and buffed

________________

NEW BUILD

Before

________________

Engineered Rustic Oak White Oiled

________________

CONVERSION OF TUDOR WATERMILL

old mill before

During Construction

________________

old mill after

38mm Opepe Deckboards

________________